Wednesday, December 1, 2021

Application Life cycle Management

 CS6302 - Application Life cycle Management

Note: Updated on 12/01/21

This tab enables you to manage the analysis items.

Analysis Menus tab

A session/user authentication process that permits a user to enter one name and password to access multiple applications.

Single Sign-on

Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and manage multiple versions of assets in parallel while maintaining data integrity and providing an audit history of changes throughout the project lifecycle.

Version control

A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the Requirements view.

Category views

Allows you to capture a group of requirements, tests, or test assets at strategic points in the project lifecycle to mark specific milestones

Baselining

This is the two modules that have been completely redesigned as part of this release of ALM 12.0

Requirements Management and Defects Management

A physical devices used to identify users in secure systems.

Smart Card Authentication

Contains the Analysis tree in which you organize all of your analysis items.

Analysis View module

This section enables you to open the ALM documentation library and other online resources.

Help section

Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test automation solution.

Business Components module

ALM support you through ____.

All phases of Application Lifecycle Management

Contains the Dashboard tree in which you organize dashboard pages.

Dashboard View module

It is a translating business goals/objectives into a realized software-enabled business process.

Creating requirements

Enables quality assurance managers to track application readiness by defining goals for activities of an application release

ALM project planning and tracking (PPT)

Using the _____, you can report flaws in your application and track their repair during all stages of the application management process.

ALM Web client

Module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition.

ALM Business Models

Enables you to manage resources used by your tests. You can organize your resources by defining a hierarchical Test Resource tree containing resource folders and resources.

Test Resources

Enable you to create and display a dynamic graphic representation of data related to test plans and test sets.

Live Analysis graphs

It supports you through all the phases of application lifecycle management. By integrating the tasks involved in application management.

Application Lifecycle Management

The HP’s strategy and software approach for modern application delivery starts with a what?

Unified platform

This cycle tests the new features with existing features that might have been impacted by the changes.

Cycle 2-Integrated System Testing

The Release Scope tab enables you to define and update release scope items.

True

This cycle ensures that the new features meet the expectations of the business.

Cycle 4-User Acceptance Testing

_______are checkpoints on a release timeline used to verify that the release and its interim deliverables are progressing as planned.

Milestones

Tests the new features of the application implemented in the release.

Cycle 1-New Features

A test set folder in the Test Lab module contains tests that are covered by your requirements.

True

______ are the means for setting objectives on Project Planning and Tracking releases and for planning and tracking release progress towards these objectives throughout its duration

Thresholds

Cycle 2 can start before the end of cycle 1.

True

Displays KPI calculations that enable you to determine the status of your release.

Scorecard tab

In the definition phase, the QA/project manager defines the scope, milestones, and KPIs for the project in ALM.

False

The testing process begins with defining defect in the Management module.

False

If an application flaw is detected while running a test set, you can submit a defect.

True

After adding a cycle to a release, you specify the details for the cycle using the _____.

Details tab

Milestones are used to measure progress in project planning and tracking.

True

Indicates whether the scheduled calculation is currently running.

Active/Inactive

Displays the progress of a release in a Gantt chart.

Master Plan tab

When you assign a requirement to a cycle, the requirement is not automatically assigned to the release.

False

Tests the performance of the application for criteria such as number of concurrent users that the application supports and the response time of the application.

Cycle 3-Performance Testing

The Detailed tab enables you to select content to include in the release scope item.

False

You cannot customize each KPI to reflect your needs.

False

Refreshes the scorecard table, so that it displays the most up-to-date information.

Generate

Enables you to increase the number of parallel calculations performed on an entire site.

Advanced Area

Indicates whether the scheduled calculation is currently running.

Active/Inactive

You create a _____ to define the hierarchical framework of releases.

Release tree

Enables you to schedule PPT calculations for your entire site.

Scheduling Area

After the _____, the release goes through further testing cycles to test aspects, such as functionality and performance of the application.

first cycle

You can add ______ to a cycle.

Attachments

Changes the speed that it takes for ALM to calculate the KPI data.

Engines Throttle

The foundation of the Management module is the ______.

Release tree

Enables you to purge calculations after a specific time period.

Purge Area

A _______ is an independent business unit within an organization, with its own set of rules, standards, resources, objectives, and applications.

Line of business (LOB)

This tab enables you to determine the business criticality, failure probability, and functional complexity of a requirement by assigning it values directly or by assigning values to a set of criteria.

Assessment Questions tab

You use the ________ to add an existing test or component to the Tests and Components list

Open button

The save options are disabled when more than one test or component is selected.

True

If you know that a test in your test set might fail, but you want to make sure that subsequent tests in the test set still execute, which of the following should you do?

Ensure that the execution condition for the arrow running out from the test is set to Finished.

Provides a clear picture of the test building blocks and assists in the execution of the actual tests.

Develop the Test Sets tree

This scanner, relevant only for web applications, checks your application for broken hyperlinks and missing referenced content

Broken links scanner

A group of tests designed to achieve specific testing goals.

Test Set

Enables you to view traceability relationships between requirements and other requirements or tests in a matrix.

Traceability Matrix

Testing is shifting to adopt Agile and Continuous Integration methodologies.

True

Sprinter software gives you the ability to test web or native applications using a cloud mobile provider

True

The Test Plan module enables you to ____ your application according to functionality.

Divide

Enables you to control the execution of automated tests by setting test run conditions and creating a schedule.

Organize test runs

A _______ is a variable that can be assigned a value during test execution

Parameter

Which of the following is not part of the steps to run in Power mode using injection?

Click the Browse button

Enables you to create links between requirements and other entities.

Requirements Details

This scanner checks your application for errors resulting from translating the application’s UI into different languages.

Localization scanner

When you are in ________, Sprinter keeps a record of all your user actions, which you can view as a list or in the Storyboard at the end of your run.

Power mode

Which of the following new features allows you to perform testing with a single motivation of identifying defects?

Exploratory testing

A good test plan enables you to assess the quality of your application at any point in the application management process

True

After finalizing the testing policy for your requirements, you can ______ a risk report that details your testing strategy for the analysis requirement.

Generate

Enables you to associate the selected requirement with other requirements in the requirements tree

Requirements Traceability

Contains tests that you can assign to cycles in the Management module. This association allows you to review the progress of tests, determine the number of resolved and outstanding defects, and enhance your reporting ability.

Test Set folder

You can _______ to a Word or PDF file. This file contains the run summary, step status, and defect information for the run session.

Export a Storyboard

The ________ module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirement definition.

ALM Business Models

Clearly defined requirements help developers set a target for themselves and the testing team to identify their testing priorities.

Aids development and testing

Sprinter runs auto tests in ALM from the Test Lab module

False

To create a _____, click the New button in the Plan area.

New Test

There are three ways to open a test in Sprinter.

False

This allows you to design a scanner that detects the desired items in your application

Custom scanner

Enables you to create and edit tests or components directly in Sprinter and save them to ALM.

Sprinter's Plan mode

You start building a requirements tree by creating a requirement within the Requirements ______at the root level.

Folder

This area displays the assigned or calculated values of the risk and functional complexity of an assessment requirement.

Assessment Results tab

Before defining manual tests, you specify the detailed steps to execute each test.

False

After you select an automatic method for conversion, you cannot customize the conversion

False

To create the Test Plan tree in the Test Plan module, you manually create folders and add tests to these folders

True

A Requirement tree is a visual ______ of the relationship between requirements.

Organization

You convert requirements to tests to automatically create a one-to-one mapping between ____________ and ______.

Requirements and tests

Enables you to view your requirements hierarchically in a tree.

Requirement Tree

After defining the subjects in the Test Plan tree, the next step is to add and define the specific tests to be performed for each subject.

True

A _______ contains the actions that must be performed during test execution.

Test script

Enables you to instruct ALM to automatically send a status alert email to the author when the test set completes execution

Set automation options

The ______ module allows you to view all test runs for your project in a grid

Test Runs

Enables you to view requirements in a flat non-hierarchical view.

Requirements Grid

What is the third stage of the testing process?

Test Planning

Enables you to record additional details about the actual test execution results.

Actual Field

A test can cover more than one______ and a requirement can be covered by more than one test.

Requirement

You run tests ________ from ALM using HP Sprinter.

Manually

Enables you to add and remove traceability links between requirements

Relationships

Enables you to analyze the breakdown of child requirements according to test coverage status.

Coverage analysis

Enables you to manage the execution of manual and automated tests and document their results.

Run the tests

This allows you to design a scanner that detects the desired items in your application.

Custom scanner

You use the ________ to add an existing test or component to the Tests and Components list.

Open button

The ______ module allows you to view all test runs for your project in a grid.

Test Runs

You can now view screen captures, in the Step tab, as full images in Run mode.

expanded view

Displays the Open ALM Test dialog box. The tests you select are added to the Tests and Components list.

Open HP ALM Test

You can now link a test run to an existing defect

link to existing defects

Adds a new blank test to the Tests and Components list.

New HP ALM Test

XML files which are compatible with HP Unified Functional Testing (UFT).

Manual Mapping Tests

When working in Power mode, you can save manual Sprinter can import the XML file and convert it to an automated GUI test.

Integration with UFT

have been made in many areas of the product, such as opening, loading, and running tests.

Performance Improvements

You can now test Web or Native applications using a cloud mobile provider (Perfecto Mobile).

Mobile Application Testing

You can now see the run steps of manual tests executed with Sprinter in ALM reports.

ALM Reporting Capabilities Improvements

Adds a new component to the Tests and Components list.

New HP ALM Business Component

Each iteration of the test must execute consistently.

consistent

A test must be appropriate for its testers and its environment.

appropriate

Converts the selected requirement to a test step

convert to step

Excludes the selected requirement from the conversion process

exclude from conversion

Converts the selected requirement to a test

convert to test

A test must map to a requirement or a process.

traceable

A test must include only the necessary steps and fields that are needed for its purpose.

economical

Converts the selected requirement to a subject folder

convert to subject

Converts the selected requirement to a test description

convert to description

Each test should have a distinct objective, such as verifying a specific function or system requirement.

accurate

Enables you to view and change the values of fields specified for the selected requirement

Details

Indicates the component of the application on which the requirement is based.

Product

Displays the number of child requirements associated with each risk category

No. of Requirements Graph

Displays a description of the selected requirement.

Description

Enables you to associate the selected requirement with other requirements in the requirements tree .

Requirements Traceability

Enables you to add and remove traceability links between requirements

Relationships

Indicates the name of the user who created the requirement.

Author

Assigns a short description of the requirement.

Name

Displays the total testing time needed to test all assessment requirements included in the risk analysis

total required testing time field

Lists the tests associated with the currently selected requirement.

Test Coverage

Lists the business model entities linked to the currently selected requirement.

Business Models Linkage

Indicates whether the requirement has been reviewed and approved.

Reviewed

Enables you to add, view, and edit rich text using an editor from within ALM

Rich Text

Indicates the release to which the requirement is assigned.

Target Release

Displays a list of changes made to the currently selected requirement.

History

Indicates the type of the requirement, which may be business, folder, functional, group, testing, or undefined.

Requirement Type

v Calculates and analyzes risk for the currently selected requirement.

Risk Assessment

Displays the total  time needed to develop all the assessment requirements, based on the required development time you estimated for each assessment requirement

Total Required Development Time Field

Indicates the cycle to which the requirement is assigned.

Target cycle

Displays the comments added by various users for the selected requirement.

Comments

Lists the defects linked to the currently selected requirement.

Linked Defects

Sets the priority level of the requirement. Selections include 1-low, 2-medium, 3-high, ␣␣very high, and 5-urgent.

priority

Indicates the execution status of tests that are linked to a requirement.

Direct Cover Status

Enables you to add attachments to a requirement.

Attachments

Enables you to analyze the impact of requirement changes by reviewing requirement relationships

Impact Analysis

 Each test should have a distinct objective, such as verifying a specific function or system requirement. 

accurate

Converts the selected requirement to a test description 

convert to description

Converts the selected requirement to a subject folder 

convert to subject

A test must include only the necessary steps and fields that are needed for its purpose. 

economical

A test must map to a requirement or a process.

traceable

Converts the selected requirement to a test

convert to test

Excludes the selected requirement from the conversion process

exclude from conversion

Converts the selected requirement to a test step

convert to step

A test must be appropriate for its testers and its environment. 

appropriate

Each iteration of the test must execute consistently.

consistent

Adds a new component to the Tests and Components list.

New HP ALM Business Component

 You can now see the run steps of manual tests executed with Sprinter in ALM reports.

ALM Reporting Capabilities Improvements

You can now test Web or Native applications using a cloud mobile provider (Perfecto Mobile). 

Mobile Application Testing

have been made in many areas of the product, such as opening, loading, and running tests. 

Performance Improvements

When working in Power mode, you can save manual Sprinter can import the XML file and convert it to an automated GUI test.

Integration with UFT

 XML files which are compatible with HP Unified Functional Testing (UFT).

Manual Mapping Tests

Adds a new blank test to the Tests and Components list. 

New HP ALM Test

 You can now link a test run to an existing defect

link to existing defects

Displays the Open ALM Test dialog box. The tests you select are added to the Tests and Components list.

Open HP ALM Test

You can now view screen captures, in the Step tab, as full images in Run mode. 

expanded view

Indicates the cycle to which the requirement is assigned. 

Target cycle

 Displays the comments added by various users for the selected requirement.

Comments

Displays the total  time needed to develop all the assessment requirements, based on the required development time you estimated for each assessment requirement 

Total Required Development Time Field

Calculates and analyzes risk for the currently selected requirement.

Risk Assessment

Indicates the type of the requirement, which may be business, folder, functional, group, testing, or undefined. 

Requirement Type

Displays a list of changes made to the currently selected requirement.

History

Indicates the release to which the requirement is assigned.

Target Release

Enables you to add, view, and edit rich text using an editor from within ALM 

Rich Text

Indicates whether the requirement has been reviewed and approved. 

Reviewed

Lists the business model entities linked to the currently selected requirement.

Business Models Linkage

Lists the tests associated with the currently selected requirement.

Test Coverage

 Displays the total testing time needed to test all assessment requirements included in the risk analysis 

total required testing time field

 Assigns a short description of the requirement.

Name

Indicates the name of the user who created the requirement.

Author

 Enables you to add and remove traceability links between requirements

Relationships

 Enables you to associate the selected requirement with other requirements in the requirements tree .

Requirements Traceability

Displays a description of the selected requirement.

Description

Displays the number of child requirements associated with each risk category

No. of Requirements Graph

Indicates the component of the application on which the requirement is based. 

Product

Enables you to view and change the values of fields specified for the selected requirement

Details

Lists the defects linked to the currently selected requirement.

Linked Defects

Sets the priority level of the requirement. Selections include 1-low, 2-medium, 3-high, ␣␣very high, and 5-urgent.

priority

 Indicates the execution status of tests that are linked to a requirement.

Direct Cover Status

Enables you to add attachments to a requirement.

Attachments

Enables you to analyze the impact of requirement changes by reviewing requirement relationships

Impact Analysis

Enables you to filter and sort the defects in the grid.

filter button

To compare two versions, press the Ctrl key and select each version. Click the Compare button.

comparing versions

The baseline in which the version appears

baseline

The development team rejected the defect. The development team provides a rationale for rejecting a defect.

rejected

The date the version was created.

date

Enables you to use the status of defects to determine whether requirements have been met.

the defect requirement association

Enables you to view a list of changes made to the defect. In addition, it displays a history of baselines in which the entity is displayed.

history tab

The testing team has verified the application and the defect has been fixed. 

closed

The version number. If the entity is currently checked out, the Version column for the checked out version displays checked out. 

version

The user who created the version.

modified by

Provides an audit trail of changes made to each defect

history tab

The defect is assigned to the development team for review.

open

Provides a text box for entering and reviewing  annotations for each defect  

description tab

The testing team has reopened a defect closed by the development team.  

reopen

 Provides filter fields from where you can define criteria for filtering the data listed in the Defects grid .

grid filter

Provides a tabular list of the defects logged for a project  

defects grid

The development team has fixed the defect, but it is pending for approval by the testing team.

fixed

Enables you to attach files, snapshots, URLs, system information, and clipboard images to provide a better explanation for a defect  

Attachments tab

The default status when a defect is reported.  

new

Lists the defects and other entities linked to the currently selected defect  

Linked entities tab

A _______ is an independent business unit within an organization, with its own set of rules, standards, resources, objectives, and applications.

Line of business (LOB

This cycle ensures that the new features meet the expectations of the business.

Cycle 4-User Acceptance Testing

Contains the Analysis tree in which you organize all of your analysis items. 

Analysis View module

Using the _____, you can report flaws in your application and track their repair during all stages of the application management process.

ALM Web client

Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and manage multiple versions of assets in parallel while maintaining data integrity and providing an audit history of changes throughout the project lifecycle

Version control

Provides filter fields from where you can define criteria for filtering the data listed in the Defects grid.

Grid filter

What is the module that enables you to manage resources used by your tests?

Test Resources

Contains the Dashboard tree in which you organize dashboard pages.

Dashboard View module

After you make changes to an entity, you _____ the entity.

Check in

You can define what data appear in a graph and how the data are organized.

True

If you know that a test in your test set might fail, but you want to make sure that subsequent tests in the test set still execute, which of the following should you do?

Ensure that the execution condition for the arrow running out from the test is set to Finished.

Enables you to manage the execution of manual and automated tests and document their results.

Run the test

After the _____, the release goes through further testing cycles to test aspects, such as functionality and performance of the application.

first cycle

The Test Plan module enables you to ____ your application according to functionality.

Divide

It supports you through all the phases of application lifecycle management. By integrating the tasks involved in application management.

Application Lifecycle Management

Module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition.

ALM Business Models

It is a translating business goals/objectives into a realized software-enabled business process.

Creating requirements

Enables you to instruct ALM to automatically send a status alert email to the author when the test set completes execution.

Set automation options

If you would like to revert an entity to a previous version, which of the following actions would you take?

Promote the entity

This section enables you to open the ALM documentation library and other online resources.

Help section

Enables you to schedule PPT calculations for your entire site.

Scheduling Area

The Defect Management module enables subject matter expert to work with Business Process testing, the HP test automation solution.

False

The ______ module allows you to view all test runs for your project in a grid.

Test Runs

Managing and tracking defects is a critical step in the testing process because it involves a lot of time and money.

True

A session/user authentication process that permits a user to enter one name and password to access multiple applications.

Single Sign-on

Contains the Dashboard tree in which you organize dashboard pages.

Dashboard view module

You run tests ________ from ALM using HP Sprinter.

Manually

What is the third stage of the testing process?

Test Planning

The ALM Business ________ module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition.

Models

Clearly defined requirements help developers set a target for themselves and the testing team to identify their testing priorities.

Aids development and testing

Enables you to purge calculations after a specific time period.

Purge Area

This is the two modules that have been completely redesigned as part of this release of ALM 12.0.

Requirements Management and Defects Management

Evaluating defects and defect trends helps you make effective go/no-go decisions.

False

You can view a list of all entities in the current module that you have checked out, and check in or undo the check out for selected entities

True

After adding a cycle to a release, you specify the details for the cycle using the _____.

Details tab

Before you create a report, you can add sub-reports. A sub-report adds an extra layer of information related to the parent report.

False

Tests the performance of the application for criteria such as number of concurrent users that the application supports and the response time of the application.

Cycle 3-Performance Testing

Enables you to create and edit tests or components directly in Sprinter and save them to ALM.

Sprinter's Plan mode

Displays KPI calculations that enable you to determine the status of your release.

Scorecard tab

Contains tests that you can assign to cycles in the Management module. This association allows you to review the progress of tests, determine the number of resolved and outstanding defects, and enhance your reporting ability.

Test Set folder

The HP’s strategy and software approach for modern application delivery starts with a what? 

Unified platform

If you begin to make changes to an entity in a version control-enabled project, you are prompted to check in the entity.

False

allows you to capture a group of requirements, test, or test assets at strategic points in the project lifecycle to mark specific milestones

Baselining

In the dashboard pages, you can arrange and view multiple graphs on a single page.

True

This tab enables you to determine the business criticality, failure probability, and functional complexity of a requirement by assigning it values directly or by assigning values to a set of criteria.

Assessment Questions tab

A test can cover more than one______ and a requirement can be covered by more than one test.

Requirement

ALM support you through ____.

All phases of Application Lifecycle Management

Provides an audit trail of changes made to each defect.

History tab

Provides a clear picture of the test building blocks and assists in the execution of the actual tests.

Develop the Test Sets tree

A document-centric viewing mode that enables you to see a list of requirements in a single document view and allows for quick editing of descriptions. This helps you to better understand the big picture.

Author mode

Enables you to manage resources used by your tests. You can organize your resources by defining a hierarchical Test Resource tree containing resource folders and resources.

Test Resource

After finalizing the testing policy for your requirements, you can ______ a risk report that details your testing strategy for the analysis requirement.

Generate

The project administrator for your organization can _______ version control through ALM Site Administration.

Enable or Disable

______ are the means for setting objectives on Project Planning and Tracking releases and for planning and tracking release progress towards these objectives throughout its duration.

Thresholds

Change is constant for applications.

True

A physical devices used to identify users in secure systems.

 Smart Card Authentication

Tests the new features of the application implemented in the release.

Cycle 1-New Features

You can use the Project Report reporting tool, available in the Analysis View module, to design and generate comprehensive reports of project data.

True

Changes the speed that it takes for ALM to calculate the KPI data.

Engines Throttle

Indicates whether the scheduled calculation is currently running.

Active/Inactive

SCA is a session/user authentication process that permits a user to enter one name and password to access multiple applications.

False

To compare two versions, press the Alt key and select each version. Click the Compare button.

False

_______are checkpoints on a release timeline used to verify that the release and its interim deliverables are progressing as planned.

Milestones

Enables you to record additional details about the actual test execution results.

Actual Field

You create a _____ to define the hierarchical framework of releases.

release tree

Sprinter is not available for ALM Essentials Edition or Performance Center Edition.

True

A group of tests designed to achieve specific testing goals.

Test Set

The ________ module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirement definition.

ALM Business Models

Enables you to associate the selected requirement with other requirements in the requirements tree

Requirements Traceability

Displays the progress of a release in a Gantt chart.

Master Plan tab

Allows you to capture a group of requirements, tests, or test assets at strategic points in the project lifecycle to mark specific milestones.

Baselining

Provides a tabular list of the defects logged for a project.

Defects grid

The foundation of the Management module is the ______.

Release tree

You can add ______ to a cycle.

Attachments

If you want to make changes to an entity in a version control enabled project, what is the first thing you must do?

Check out the entity

You can _____graphs for viewing in a web browser without downloading an ALM client.

Share

Enables you to create links between requirements and other entities.

Requirements Details

A _______ contains the actions that must be performed during test execution.

Test script

Enables quality assurance managers to track application readiness by defining goals for activities of an application release.

ALM project planning and tracking (PPT)

You use the Graph wizard to generate an old graph.

False

A _______ is a variable that can be assigned a value during test execution.

Parameter

Match the missing word/details to complete each statement. 

In the past, before the ________________ was published and before organizations realized that their previous waterfall approach to software development was inefficient and prone to scope creep, cost overruns and missed deadlines, each of the disciplines that made up the overall software process was completely separate.

Agile Manifesto

___________________ should have functionality that helps you make sense of your requirements and ideally the tools should be adaptable to your methodology and processes rather than the other way around.

ALM tools

Instead of a set of _______________________ working in a vacuum to define the vision and requirements, handing off the design to the developers, handing off the code to the testers, handing off the product to the IT support team to deploy and maintain, you now have a single ALM process spanning all these elements continuously delivering new features every X weeks.

business analysts

__________________ is basically the fusing together of the disciplines concerned with all aspects of the software delivery process:

ALM

Once organizations realized how much more efficient they can be having _________________ that collaboratively define the requirements, plan the releases and sprints, test the product during development and deploy the latest update in a seamless way, the old separate processes didn’t make sense.

integrated teams

What are the physical devices used to identify users in secure system?

Smart Cards

Enable you to create and display a dynamic graphic representation of data related to test plans and test sets.

Live Analysis graphs

You convert requirements to tests to automatically create a one-to-one mapping between ____________ and ______.

Requirements and tests

This cycle tests the new features with existing features that might have been impacted by the changes.

Cycle 2-Integrated System Testing

It empowers IT to manage the core application life cycle, from requirements through deployment, granting application trams the crucial visibility and collaboration needed for predictable, repeatable, and adaptable delivery of modern applications.

ALM

Version control enables you to create and manage ALM entities while maintaining previous versions of these entities

True

Refreshes the scorecard table, so that it displays the most up-to-date information.

Generate

You can create and manage entities in a version control-enabled project in both tree and grid views.

True

A group of tests designed to achieve specific testing goals.

Test Set

A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the Requirements view.

Category views

Enables you to control the execution of automated tests by setting test run conditions and creating a schedule.

Organize test runs

Enables you to view your requirements hierarchically in a tree.

Requirement Tree

Contains tests that you can assign to cycles in the Management module. This association allows you to review the progress of tests, determine the number of resolved and outstanding defects, and enhance your reporting ability.

Test Set folder

In a version control-enabled project, you can only make changes to an entity by checking it in.

False

You run tests ________ from ALM using HP Sprinter.

Manually

Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test automation solution.

Business Components module

Enables you to increase the number of parallel calculations performed on an entire site.

Advanced Area

A group of tests designed to achieve specific testing goals.

Test Set

1 comment: